THE PROJECT
We were appointed to deliver a high-security perimeter upgrade for a data centre in the West Midlands, protecting critical infrastructure including transformers and sensitive equipment. The project involved the installation of SR2-rated security fencing, gates, anti-ram protection, as well as rotating anti-climb systems to significantly enhance perimeter security and deter unauthorised access.
Working within a live, high-security environment, our team carried out a full site assessment before designing and installing a tailored solution. This included in-house fabricated elements such as a bespoke manually operated gate and custom anti-climb features, all fully integrated with the site’s existing access control systems. The works were completed safely, efficiently, and with minimal disruption to ongoing operations.
Sector: Security Rated
Product Type: SR2 358 Mesh Fencing and Gates
Finish: Galvanised & Polyester Powder Coated Black (RAL 9005)
Location: West Midlands
THE CLIENT
Our client was a confidential blue-chip company operating a critical data centre facility in the UK. Due to the sensitive nature of the site, strict security protocols and operational requirements were in place throughout the project.
We worked closely with the client’s facilities and security teams to ensure all works met their high standards for safety, compliance, and performance. By delivering a reliable and future-proof security solution, we helped enhance the resilience of their infrastructure while maintaining full operational continuity